Greaves Solar Farm

GB NRG delivered the full scope of works on the 5 MW Greaves Solar Farm in Old Hutton, Kendal. Our team managed all mechanical and LV electrical installations, ensuring the project was completed safely, efficiently, and to the highest quality standards.

The Detail

System Size:

5MW


Energy Output

This ground-breaking collaboration showcases the power of renewable energy and the potential for significant cost savings.

Est. Annual Generation (KWh)

4,200,000

Est. Return On Investment (ROI)

6 Years

Est. CO2 Reduced (Annually)

995 tons

greaves solar farm

OUR SERVICE


  • A zero cost no obligation energy audit on your business with options for how best to reduce your energy bills and carbon footprint
  • Our free commercial solar design offers tailored solar solutions engineered to meet energy needs, cutting-edge design that optimises space, and efficient power generation.
  • Professional installation of solar systems and battery storage for businesses, ensuring efficiency, sustainability, and optimal energy production
  • Our services encompass both reactive and preventative maintenance for commercial energy systems. We specialise in servicing and repairing solar PV systems

TO COMBAT CLIMATE CHANGE, IT’S IMPERATIVE TO MAKE RESPONSIBLE ENERGY CHOICES.

JON ANTONIOU – CEO & FOUNDER

// Faq

How long did the install take?

Just under 3 months.

What is the expected lifespan of the system?

The system is designed to last for 25 to 30 years or more.

BOOK YOUR FREE assessment HERE


Optimise commercial solar efficiency with a thorough energy assessment for peak performance.

Talk to us


Our team are here to help with enquiries and questions. Please use the form or contact number and we will get back to you right away.